Claremont Roberts Pavilion 

Project Description Construction of a new 132,000 square foot – 3 level fitness and sports arena/events center.  The mechanical portion of the project includes (10) air handlers with VFDs, heat recovery units, smoke evacuation system, fan coils, (13) indoor D/X splits, (3) outdoor condensing units, sound traps, exhaust fans, pumps, motorized dampers, VAV boxes, exhaust valves, ducting, refrigerant piping, CW and HW piping, and underground hydronic piping. The HVAC system will be supplied by the newly constructed energy-efficient central plant and the plumbing fixtures are all low flow water fixtures.  The college will be seeking a LEED Gold certification.  

Project Type Plans and Specifications, BIM

 

General Contractor           
PCL

Architect                
John Friedman Alice Kimm Architects 

Mechanical Engineer            
Buro Happold 

Contract Amount            
$6.7 million

Completion                
Early 2016

 