USC Central Plant Parking Structure "A" 

Project Description PPC constructed a new central plant utilizing space in and around the existing Parking Structure "A".  The mechanical portion consisted of the installation of (2) 1,250-ton water-cooled chillers, (3) cooling towers, chilled water pumps, condenser water pumps, air handler units, central plant pipe valves and fittings with VFDs, distribution piping,  and mechanical exhaust system.  The Plumbing portion of the project included the addition of floor sinks, floor drains, waste, vent, and water.  

Project Type Plans and Specifications, BIM

 

Mechanical Engineer            
P2S Engineering 

Contract Amount            
$7.8 million 

Completion                
February 2014