Quiksilver Headquarters Campus Project

Project Description This tenant improvement project transformed an existing 115,000 square-foot warehouse into a state-of-the-art creative office space for Quiksilver.  The HVAC portion of the project included the installation of (4) 10-ton air-cooled split systems.  Each system consisted of an outdoor air cooled condenser with dual refrigeration circuits, refrigerant piping and digital scroll compressors for precise capacity control and energy efficiency.  Due to weight constraints of the existing roof structure, a DuctSox system was installed.  This fabric HVAC ducting system also complimented the aesthetic goals of the owner.  Bathrooms were installed with water-saving fixtures.

Project Type Plans and Specifications

 

General Contractor
RBA Builders

Architect
Gensler Architects 

Mechanical Engineer
Engineering-Design-Analysis, Inc. 

Contract Amount
$1.5 million 

Completion
September 2011