Pomona Valley Hospital Outpatient Pavilion

Project Description The construction of this new three story, 55,000 square-foot, Outpatient Pavilion included five outpatient surgery suites, twenty preparatory and recovery beds, state-of-the-art physical therapy facilities, and administrative support for the hospital.  The mechanical portion of the project included (5) air handlers with VFDs, (15) A/C split systems, clean suite surgical systems, supply and return boxes, exhaust systems, duct work, controls, (3) hot water boilers, steam boiler, pumps, expansion tank, air separator, chilled and hot water piping, medical gas piping and equipment and condensate piping. This project is LEED Silver certified.

Project Type Plans and Specifications; BIM

 

General Contractor
gkkworks

Architect
gkkworks

Mechanical Engineer
Glumac

Contract Amount
$6 million

Completion
March 2015
                
Complexity
To ensure that we met the aggressive construction schedule, substantial labor resources were dedicated in a condensed timeframe.