Fox Studios Central Plant
Project Description Construction of the central plant included a 750-ton chiller, pumps, VFDs, air separator, expansion tank, piping system, DDC controls, and commissioning. The central plant was constructed within an existing historic building.
Project Type Plans and Specifications, BIM