Fox Studios Central Plant 

Project Description Construction of the central plant included a 750-ton chiller, pumps, VFDs, air separator, expansion tank, piping system, DDC controls, and commissioning.  The central plant was constructed within an existing historic building. 

Project Type Plans and Specifications, BIM

 

General Contractor             
Plumbing, Piping and Construction, Inc.             
                    
Mechanical Engineer            
Glumac 

Contract Amount     
$2.5 million 

Completion                
January 2014

 