Caltech Professor Shapiro Laboratory

Project Description This project was the completion of new laboratory within an existing building.  The project included fume hoods, new and modified exhaust systems, and new chilled and heating hot water air handling systems as required to supplement the existing building systems.  The laboratory includes (10) tight-tolerance temperature/pressure variable control zones.  The plumbing system includes process utilities including DI water, natural gas, vacuum, high-pressure air, laboratory compressed air, Nitrogen, Carbon Dioxide, Oxygen, acid waste and vent, industrial cold and hot water, industrial waste and domestic cold water.

Project Type Design and Build

 

General Contractor           
Matt Construction, Inc.

Architect               
CO Architects

Mechanical Engineer           
P2S Engineering

Contract Amount             
$553,000

Completion                
January 2014